We have cooperated with more than 200 countries in solar energy projects and road lighting projects. We have exported products to many countries and participated in many important government projects around the world.
Date: June, 2025
Type: Off‑Grid High‑Pole Solar Lighting for Transport Corridors
Setup Location: Kenya
Product Series: Anern SLV Series
Product Configuration: SLV 150W
Installation Parameters: 20m pole height
This Kenya project deployed Anern SLV 150W all‑in‑one solar street lights on 20‑meter poles to support high‑elevation lighting requirements for transport corridors and large open road sections. The project emphasized safe visibility from elevated mounting points, reduced on‑site assembly complexity, and a standardized solar lighting approach without dependence on grid construction.
Tall‑pole glare control and light distribution requirements
On‑site lifting logistics and limited crane availability
Higher risk of installation errors during work at height
Stronger need for uniform lighting along long straight corridors
Remote locations with limited spare parts and service response
Pressure to standardize specifications for tendering and acceptance testing
Anern provided the SLV 150W cost‑effective all‑in‑one solar street light to support high‑pole deployment with simplified installation and practical project economics.
Key advantages:
All‑in‑one integration reduces separate component handling, cabling work, and on‑site assembly steps—important for 20m pole operations
150W configuration supports higher-output lighting needs for elevated mounting applications (site-dependent design)
Standardized product selection helps contractors manage procurement, spares, and multi-site consistency
Off‑grid deployment model avoids trenching, utility approvals, and grid-connection scheduling risks
Practical for corridor projects where rapid rollout and repeatable installation methods are critical
Anern SLV 150W in Kenya







Improved night-time visibility from elevated lighting points
Reduced installation steps and better on-site execution efficiency
More consistent rollout across multiple locations using a standardized model
Lower exposure to grid-extension delays and civil-work uncertainty
A replicable approach for high-pole corridor lighting programs
Product page: Anern SLV
More Reading:
Solar Street Light Maintenance
Solar Street Light Installation Guide
Q1: Can SLV 150W be used on 20m poles?
A: It can be applied in high-pole projects depending on the required illumination level, road width, and spacing plan; final design should be verified by site lighting targets.
Q2: Why choose an all‑in‑one light for tall-pole installation?
A: All‑in‑one integration reduces parts, wiring, and lifting-time complexity, which helps improve installation efficiency and reduces work-at-height risk.
Q3: Does off‑grid solar lighting reduce project coordination workload?
A: Yes. It avoids utility connection steps, trenching coordination, and power-supply scheduling constraints.
Q4: What makes SLV suitable for cost-controlled programs?
A: The SLV series is positioned as a cost-effective solution with standardized configurations that support procurement efficiency and repeatable deployment.
Q5: What information is needed to finalize a layout plan?
A: Typical inputs include road width, target brightness/uniformity, pole spacing, local solar resources, and required lighting hours per night.
Contact us today for pricing, technical support, and project solutions